Cover / Quick services / Septic Feasibility Review
Q-04 · Quick serviceSeptic feasibility review.
Before you buy a lot, plan an addition, or convert a cottage, find out whether a sewage system will fit. The review checks the lot information against Part 8 clearances and sizing and tells you what is likely to work.
- Starting fee
- $550Desk review, plus HST
- Turnaround
- 5 daysBusiness days from complete information
- Code basis
- Part 8OBC 2024
- Estimated design flow for the planned use
- Clearance check against wells, water, lot lines and buildings
- Likely system type and design tier
- The testing needed before design
- Written summary under BCIN 513381
- Before buying a vacant or waterfront lot
- Before adding bedrooms or an additional unit
- Converting a seasonal cottage to year-round
- Planning a new house on an existing system
- Survey or lot sketch
- Planned use and bedroom count
- Well locations, including neighbours’
- Any existing permits, soils reports or system records
- Site photos
How it works
Send the drawings
Plans, site information, and what you need. Upload links and PDFs are fine.
Confirm scope and fee
You get a fixed fee and a delivery date, usually the same business day. Nothing starts until you approve it.
Design and check
Calculations and drawings prepared to the 2024 Ontario Building Code, then checked before issue.
Receive the package
Signed drawings and calculations under BCIN 513381, ready to submit. Questions from the first review are answered.
Price and turnaround
| Ref | Service | Fee |
|---|---|---|
| QS-04 | Septic feasibility review — desk review | from $550 |
| — | Site visit | quoted |
All fees plus HST. Payment Net 14 by e-transfer. Referred work gets priority scheduling. The fee is confirmed in your quote before work begins.
This is a review, not a design. It does not replace soils testing or a permit application. When you are ready, see septic design.
Frequently asked
Is this a guarantee that a system will be approved?
No. It is a professional opinion on what is likely to fit, based on the information available. Approval depends on soils testing and the permit review.
Do you need to visit the lot?
Often the survey, photos, and existing records are enough. Where they are not, a site visit is quoted before the review starts.
Ready to order?
Send what you have. You’ll get a fixed fee and a delivery date before any work starts.